Alfalfa Dehydration Plant in Romania

Industrial installation designed for alfalfa processing and dehydration, a complete line tailored to the client’s requirements.

The plant integrates different process stages to ensure efficient material treatment and stable production.

Technical Data

Location: Rumanía

Material: Alfalfa

Processes: Drying, densification

Type of installation: Complete plant

Main Machinery:

Trommel
Cooler

Product Testing in Our Laboratory

We carry out tests using the client’s material in our laboratory to analyze its behavior during the drying process and define the optimal process parameters.

Design, manufacturing and maintenance

Industrial support backed by experience.

Contact

+34 976 16 65 52

info@afau.net

Address

Políg. Ind. Los Royales 

50750 Pina de Ebro (Zaragoza)

España